Start with work you already buy
Review a representative period of supplier invoices and part demand. Separate material cost from cutting services where possible, and include freight, inspection, rework and secondary processing on the same basis for both options. Identify which jobs could actually move to the proposed machine.
Build three demand scenarios
Use the same CAD or USD basis throughout. Populate this worksheet with your own figures; the scenario labels are not utilization forecasts.
Ownership decision worksheet| Input | Low demand | Expected demand | Higher demand |
|---|
| Annual accepted parts | Confirmed baseline work | Repeatable forecast | Supported additional demand |
|---|
| Productive hours | Include setup and downtime | Use observed cycle estimates | Check staffing and downstream capacity |
|---|
| Avoided outside spend | Only transferable work | Same part mix and scope | No unconfirmed sales assumed |
|---|
| Annual in-house cash costs | Labour, gas, power, consumables, maintenance and other incremental costs | Recalculate for this workload | Include extra staffing or capacity costs |
|---|
| Net annual savings | Avoided spend minus incremental costs | Same calculation | Same calculation |
|---|
| Simple payback | Installed investment ÷ positive net annual savings | Same calculation | Same calculation |
|---|
Include continuing outsourced jobs consistently on both sides. Avoid double-counting costs already included in a supplier price or an ownership estimate. Treat raw-material differences, scrap credits and financing separately and document your assumptions.
Check the capacity behind the estimate
A machine’s available shift hours are not all productive hours. Account for programming, loading, sorting, planned maintenance and interruptions. A cutting trial helps estimate the work cycle; it does not establish future demand.
Simple payback omits the timing of cash flows, financing, tax effects and residual value. Use it as an initial comparison and review a fuller cash-flow model before committing funds.
Build the installed and operating budget and prepare a comparable quotation.